Kōrero: Engineering on the sea floor

Māui A in position

Māui A in position

To secure the Māui A platform to the seabed, it was floated into an upright position and dropped to the sea floor. Each of the platform’s four feet were pinned to the seabed by seven piles. These were to be driven into the mud and sand to a depth of 73 metres, but a layer of sand at around 25 metres proved difficult to penetrate. The entire anchoring system had to be re-designed, and only 16 of the 28 piles could be driven to the full 73 metres.

Te whakamahi i tēnei tūemi

Private collection
Reference: Paul Fried and others, The story of Maui. Wellington: Maui Development, 1979, p. 68
Photograph by Harland Charters and Rowan Guthrie

This item has been provided for private study purposes (such as school projects, family and local history research) and any published reproduction (print or electronic) may infringe copyright law. It is the responsibility of the user of any material to obtain clearance from the copyright holder.

Ngā whakaahua me ngā rauemi katoa o tēnei kōrero

Te tuhi tohutoro mō tēnei whārangi:

Keith Lewis, 'Engineering on the sea floor - Drilling the Māui gas field', Te Ara - the Encyclopedia of New Zealand, http://www.TeAra.govt.nz/mi/photograph/6642/maui-a-in-position (accessed 25 April 2024)

He kōrero nā Keith Lewis, i tāngia i te 12 Jun 2006