Māui A was the first gas platform to be anchored to the seabed above the Māui gas field, in January 1976. This diagram shows the platform and pipeline in relation to New Zealand. Two submarine pipelines, about 34 kilometres long, carried condensate (light oil) and gas to the Taranaki coast, coming ashore at Ōaonui. Māui B was constructed in 1993.

Te whakamahi i tēnei tūemi

Te Ara - The Encyclopedia of New Zealand

Source: Ministry of Economic Development

This item has been provided for private study purposes (such as school projects, family and local history research) and any published reproduction (print or electronic) may infringe copyright law. It is the responsibility of the user of any material to obtain clearance from the copyright holder.

Ngā whakaahua me ngā rauemi katoa o tēnei kōrero

Me pēnei te tohu i te whārang

Keith Lewis, Engineering on the sea floor – Drilling the Māui gas field, Te Ara – the Encyclopedia of New Zealand, https://teara.govt.nz/mi/map/6640/mining-the-maui-gas-field (accessed 4 June 2026).